Paseo Santa Fe Streetscape Improvements

Print
Press Enter to show all options, press Tab go to next option

The area, known as Paseo Santa Fe, encompasses the S. Santa Fe Avenue corridor between Vista Village Drive and Civic Center Drive. The City's vision is to fill the area with retail/shops/restaurants topped with living spaces to revitalize the downtown area. Construction is being done in three phases.

Phase I
This phase was completed in 2016 and extends from Main Street to Ocean View Drive. Learn more here. 

Phase II
Began December, 2017 and extends from Ocean View to Terrace drives.
Construction includes street improvements similar to Phase 1 with the installation of a roundabout at Guajome and Terrace drives. Construction is expected to be completed in March, 2020. Learn more here.

Phase III
Extends from Terrace Drive to Civic Center Drive and includes installing a roundabout at Pala Vista Drive. This phase has been designed; however, it is currently unfunded.   

  • Sign up for PSF construction updates here.
  • Frequently asked questions here.

PSF GATEWAY Arch Udpated

CONTACT
Engineering Department

P: 760.639.6111

 

 

 

 

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer